Business Mathematics
21. An LPP has ______________.
- one optimal solution.
- two optimal solutions.
- Three optimal solutions.
- none of these.
Correct answer: (D)
none of these.
22. The two forms of LPP are ______________.
- standard form and canonical form.
- standard form and general form.
- matrix form and canonical form.
- matrix form and standard form.
Correct answer: (A)
standard form and canonical form.
23. In the standard form of LPP if the objective function is of minimization then the right hand side of the constraints should be ______________.
- positive.
- negative.
- non-negative.
- zero.
Correct answer: (C)
non-negative.
24. In simplex method the LPP has unbounded solution if the variable in the key column is ______________.
- maximum.
- minimum.
- positive.
- negative.
Correct answer: (D)
negative.
25. Which of the following is not true about feasibility?
- it cannot be determined in a graphical solution of an L.P.P.
- it is independent of the objective function.
- it implies that there must be a convex region satisfying all the constraints.
- extreme points of the convex region gives the optimum solution.
Correct answer: (A)
it cannot be determined in a graphical solution of an L.P.P.
26. Network models have advantage in terms of project ______________
- Planning
- Scheduling.
- Controlling.
- All the above.
Correct answer: (D)
All the above.
27. If an activity has zero slack,it implies that ______________
- It lies on the critical path.
- It is a dummy acitivity.
- The project is progressing well.
- None of the above.
Correct answer: (A)
It lies on the critical path.
28. Float or slack analysis is useful for ______________
- Projects behind the schedule only.
- Projects ahead of the schedule only.
- Both a & b.
- None of the above.
Correct answer: (A)
Projects behind the schedule only.
29. Crashing is the process of reducing the total time that it takes to complete a project by expanding ______________
- Additional funds.
- No.of.days
- Both a & b
- None of the above
Correct answer: (A)
Additional funds.
30. Network is the graphical display of a project that contains both _________________
- Activities and events.
- Activities and dummy activities.
- Both (a) & (b).
- Neither (a) nor (b).
Correct answer: (A)
Activities and events.